Ascent Energy Services
Read all reviews for Ascent Energy Services →
Problems with EV Installation
Our Ohme EV charger was installed in March, 2024 at our home address by Ascent Energy Services (AES). Today, Friday 26th July, 2024, an engineer from OVO Energy attended at our property, but was unable to install a smart meter in our meter box. He stated that due to the configuration of the wiring for the EV charger, carried out by AES, there is now insufficient space in the meter box to accommodate a smart meter! He also pointed out that the top left corner of the wooden backboard, on which the current electricity meter and consumer unit etc. are mounted, is damp/wet. This has been caused by a leak created when AES drilled through the top left section of the meter box when installing the EV charger. Without a smart meter, we are unable to benefit from OVO's "Charge Anytime" tariff, which would allow us to smart charge our EV at super low prices. I now have to ask Ohme/AES to fix the wiring problem and the leak ASAP. Only then can installation of a smart meter take place!! Submitted for your information.